Lean Construction & Last Planner System
A deeper construction, engineering & real estate workshop pack for people who own delivery: advanced frameworks, structured practice and full facilitation support around lean construction & last planner system.
Key highlights of this program
click any module — full details open belowWhat’s inside the package
Everything in this program is designed for real delivery — not just a slide dump. Hover any component for its key points.
Presentation deck — Lean Construction & Last Planner System (250+ slides)
Session-by-session slides, ready to present
Facilitator guide
Step-by-step session plan with speaker notes
Participant workbook
Print-ready pages participants work through
Activities, games & icebreakers pack
Keeps the room engaged and participating
Assessment & evaluation forms
Check understanding and capture feedback
Job aids & handouts
One-page references participants keep at work
Session timing plan
Minute-by-minute agenda for smooth delivery
Follow-up email templates
Reinforce learning after the session
Certificate of completion template
Recognise participants after the session
About this program
Lean Construction & Last Planner System is delivered as a complete, ready-to-run training programme — not a slide dump. The pack opens with a structured presentation you can present as it is, session by session, and pairs it with a facilitator guide that tells the person running the room exactly what to do, say and ask at every step. Participant workbook pages, activities, assessments and job aids are all included and print-ready.
The programme is designed for managers, specialists and functional leads who own delivery, and sits inside our Construction, Engineering & Real Estate collection. The advanced edition goes beyond awareness into fluency: advanced frameworks, case clinics and structured practice rounds with observation checklists.
Everything is delivered in editable formats, so you can adapt examples, terminology and timings to your audience. Run it in person, virtually or hybrid — the session plan covers all three, and your license allows unlimited internal delivery.
By the end, participants can
Hover an outcome to see where it’s covered.
- Apply advanced lean construction & last planner system frameworks to complex, real scenarios
- Diagnose cases quickly using structured pattern libraries
- Run practice rounds with observation checklists and peer feedback
- Customise the included toolkit to your organisational context
- Build reinforcement rhythms that embed the capability
- Coach others using the templates and job aids provided
Curriculum
6 facilitation-ready modules with activities, discussion prompts and job aids. Click a module — the full section-by-section breakdown opens with real package pages.
Free starter pack
Not sure yet? Download the Lean Construction & Last Planner System starter pack — free.
Get Module 1, the full training plan, a participant workbook sample, assessments and the table of contents. No cost, no commitment — see the quality before you buy.
Free guides & insights
Deep-dive articles about lean construction & last planner system — two of them include free downloadable resources.