FREE RESOURCE INSIDE 6 min read

Free Lean Construction & Last Planner System Starter Pack: Module 1, Training Plan, Workbook & Assessments

Download the free Lean Construction & Last Planner System starter pack — the first module, a ready-made training plan, a participant workbook sample, assessments and the full table of contents. No cost, no commitment.

This is the free, no-commitment way to evaluate our Lean Construction & Last Planner System programme before your organisation spends a cent. The starter pack contains five genuine extracts from the full programme — not a brochure.

What is inside the free starter pack

Module 1 — the complete opening module from the presentation deck, ready to present.

Training plan — the minute-by-minute session plan the facilitator runs from.

Workbook sample — real participant pages, not screenshots.

Assessments — the evaluation forms used to capture understanding and feedback.

Table of contents — the full programme structure so you can see exactly what the complete pack covers.

Who it is for

The programme is designed for managers, specialists and functional leads who own delivery. If you are a trainer, facilitator, consultant or L&D lead evaluating material for an upcoming construction, engineering & real estate session, the starter pack was built for exactly that decision.

How to use it this week

Open the training plan and imagine your next cohort. Present module 1 once, exactly as scripted, and watch how the room responds. If the quality is what you need, the complete programme is one step away.

Upgrade when you are ready

Ready to deliver? The full Lean Construction & Last Planner System programme pack is $87 — or start with the free starter pack and see the standard for yourself.

Free Lean Construction & Last Planner System Starter Pack — 5 downloads

Get the free downloads for this topic — module 1, training plan, workbook sample, assessments and the table of contents.